First Operating Session with Car Cards

I did my first operating session on my model train layout with car cards. I took video with my phone and here are the videos. I broke the video in two because it was too long to upload and I wanted to edit out a few bits where I put the phone down to throw switches.

The main reason I wanted to show these videos was to show how I use the car cards I described in the previous post.

Part 1

In part 1 I brought CN 3665 and train into Georgetown and did some switching. The train had a CP locomotive and a car to drop at the CP interchange, a grain car for the UGG elevator in town, and a caboose.

The work done was to service the CP interchange, pull the loaded cars from the UGG grain elevator, and drop the empty grain car (plus two other grain cars that were in the siding) at the UGG elevator.

Part 2

In part 2 I pulled two cars from the Irving Oil siding, and delivered one of those to the CP interchange, then collected up the train and left Georgetown for Winnipeg.

Comments

So – what do you think?

Personally I think I will use a tripod arrangement next time so the video isn’t so shaky, and I’ll be able to have two hands free – one for the throttle and one to throw switches and uncouple. I also need to look into a skewer or something similar to uncouple cars. So many things… so little time.